$29 per month for 20 permits, or $4.99 for a single permit. Record a voice memo or type the job the way you'd brief the crew, and ArcDocs fills all 9 NFPA 70E energized work permit fields into a PDF. You review and correct every field before you download.
- Price
- Free: 3 lifetime permits with an ArcDocs watermark, no credit card. Pay per permit: $4.99, no subscription. Pro $29/mo (20 permits a month, no watermark, permit history). Team $79/mo (75 permits a month, company name on permits). Works in a phone browser, no app to install. Permit PDFs are deleted from its servers after 30 days, so download and file your copy.
- Who it's for
- Houston electrical contractors doing commercial and industrial work, where energized work above 50 volts needs a written NFPA 70E permit before the cover comes off.
- Where it pays back
- Your job briefing becomes a filled-in energized work permit PDF to review and sign, instead of writing out all 9 fields by hand at the panel.Estimate, not a tested result: at $4.99 a permit, paying per permit costs less until you write 6 or more a month. From there, Pro at $29 a month for 20 permits is the cheaper way to go.
Skip it if you do residential service and de-energize before you work, or you don't have an arc flash study or labels to pull values from. ArcDocs fills in the permit; it doesn't do the arc flash math.

